Báo cáo phòng thí nghiệm & kỹ thuật
Báo cáo kỹ thuật
Một báo cáo kỹ thuật kỹ thuật có trang tiêu đề chính thức, số báo cáo và bảng sửa đổi tài liệu.

main.tex
\documentclass[11pt]{article}
\usepackage[margin=1in]{geometry}
\usepackage{xcolor}
\usepackage{booktabs}
\usepackage{tabularx}
\usepackage{siunitx}
\usepackage[hidelinks]{hyperref}
\definecolor{accent}{HTML}{334E68}
\setlength{\parindent}{0pt}
\setlength{\parskip}{0.5em}
\begin{document}
% ---------- Title page ----------
\begin{titlepage}
\begin{center}
{\color{accent}\rule{\textwidth}{2.5pt}}\\[0.4em]
{\large\scshape Meridian Structural Consultants}\\
{\small Civil and Structural Engineering \quad | \quad Portsmouth, UK}\\[0.2em]
{\color{accent}\rule{\textwidth}{0.8pt}}
\vspace{3.2cm}
{\Huge\bfseries\color{accent} Load Rating Analysis of the\\[0.25em] Alder Creek Road Bridge}\\[1.2em]
{\large Assessment of Live-Load Capacity under BD 21 Criteria}
\vspace{1.6cm}
\begin{tabular}{r l}
\textbf{Report No.} & MSC-TR-2026-041 \\
\textbf{Revision} & C \\
\textbf{Date} & 15 May 2026 \\
\textbf{Prepared for} & Wexford County Highways Department \\
\textbf{Prepared by} & R. Adeyemi, CEng \\
\textbf{Checked by} & L. Marchetti, CEng \\
\textbf{Status} & Issued for Review \\
\end{tabular}
\vfill
\textbf{\color{accent} Revision History}\\[0.4em]
\begin{tabularx}{\textwidth}{c c X c}
\toprule
\textbf{Rev} & \textbf{Date} & \textbf{Description} & \textbf{Approved} \\
\midrule
A & 20 Mar 2026 & Initial draft for internal review & LM \\
B & 14 Apr 2026 & Updated girder section losses from site inspection & LM \\
C & 15 May 2026 & Incorporated client comments, revised load factors & LM \\
\bottomrule
\end{tabularx}
\vspace{1em}
{\color{accent}\rule{\textwidth}{0.8pt}}\\[0.3em]
{\small This document is confidential and prepared solely for the named client.
It may not be reproduced without written permission.}
\end{center}
\end{titlepage}
% ---------- Body ----------
\section{Introduction}
The Alder Creek Road Bridge is a two-span steel girder bridge built in 1968
carrying a single carriageway over Alder Creek. Wexford County Highways
Department commissioned this assessment after routine inspection identified
section loss in the bottom flanges of both main girders.
\section{Scope}
This report determines the safe live-load capacity of the superstructure,
accounting for measured corrosion losses, and recommends any interim traffic
restrictions. Substructure and hydraulic assessments are outside the scope.
\section{Summary of Findings}
The governing girder retains \SI{87}{\percent} of its original flexural
capacity. The bridge can safely carry vehicles up to \SI{32}{\tonne} gross
weight without restriction. A repainting and monitoring programme is
recommended within 24 months to arrest further section loss.
\end{document}
Trong ứng dụng: mở thư viện Dự án mới, cài đặt gói {nhãn} trong "Nhận thêm mẫu" và mẫu này xuất hiện cùng với bản xem trước trực tiếp và tạo dự án chỉ bằng một cú nhấp chuột. Quá trình biên dịch chạy cục bộ trên công cụ đi kèm.